Pictures 2:
12/23/2001:



This is where I will be adding the Digitrax DS-54s for turnout control there are five turnouts used in this area that it is critical that they be thrown correctly. I will need to use the route capability of the DS-54s and my Chief. If the turnout is thrown that makes the train go in front of the mountain I need to make sure 3 other turnouts are thrown to line up for that route. If the train goes behind the mountain there is a passing siding along with the mainline and the line that connects from the front of the mountain. So the ability to setup routes will be very important here.








12/15/2001: